002 gas turbine repair
-
Basic gas turbine repairs unit `005 Arak shazand petro chemical center powerplant
-
Basic repairs and HGPI and Gas units Nyshabur powerplant model (GEF9)
-
Basic repaires and HGPI Neyshabur powerplant Gas units model(GEF9)
-
Basic repairs gas turbine 001
-
Basic repairs one unit F5 Shariati Mashhad combined cycle powerplant
-
Basic repairs unit G14 Yazd combined cycle powerplant
-
combustion chamber observation and hot line observation (4 units)
-
F5 unit overhaul of Kangan gas power plant
-
F9 unit overhaul of Zahedan gas unit
-
F9 unit turbine and generator semi-fundamental repairs of Mobin power plant in Asalooeye
-
First row nozzle replacement of GEF9 units 7&8 of Shariaati power plant
-
Gas turbine overhaul NO 8 model GEF6 kish powerplant
-
Gas generator turbine 004-turbine fundamental repairs
-
GEF5 number 3 gas turbine gas hot line observation and gas turbine repairs
-
GEF9 gas turbine-Boiler observation
-
GEF9 gas unit 7 fundamental repairs
-
GEF9 gas unit 8 fundamental repairs
-
GEF9 Nozzle replacement (2units)
-
Installing and launching F5 and F6 gas units in Kish Island
-
Installing and launching F5 and F6 gas units in Kish Island
-
Kangan gas power plant unit 1 overhaul
-
Kangan gas power plant unit 3 overhaul
-
Kangan gas power plant unit 6 overhaul
-
Kangan unit 2 repair
-
Nozzle replacement and combustion chamber observation of 4 units ibn Neyshaboor power plant
-
Observation of units 2and 6 hot line of Kangan gas power plant
-
Repair and renovate turbin and generator contract units G11, G12, G13 Geshm Pasargad powerplant
-
Repair and renovate turbine and generator contract Units G11, G12, G13 Qeshm passargad powerplant
-
Repair and renovate turbine and generator units G11,G12 , G13
-
Repairs and Gas Turbine overhaul No 4 (Model GEFS-AEGKANIS)
-
Repairs and l Gas turbine overhale NO5 (model GEF5-AEG KANIS)
-
Repairs and overhaul
-
Turbine and generator overhaul Gas unit 1 model GEF6 Kish powerplant
-
Turbine gas hot line observation
-
Unit 1 GEF5 gas turbine nozzle replacement and combustion chamber observation
-
Unit 2 GEF5 gas turbine nozzle replacement and combustion chamber observation
-
Unit 2 hot line observation of Ghaen gas power plant
-
Unit 2 hot line repairs of Kangan gas power plant
-
Unit 2 overhaul of Ghaen F5 power plant
-
Unit 2 repair of Kish power plant
-
Unit 3 GEF5 gas turbine nozzle replacement and combustion chamber observation
-
Unit 3 repairs of Kangan power plant
-
Unit 3 turbine and generator complete overhaul of Zahedan gas power plant
-
Unit 4 GEF5 gas turbine nozzle replacement and combustion chamber observation
-
Unit 4 hot line repairs of Kangan gas power plant
-
Unit 4 repair of Kangan power plant
-
Unit 5 fundamental repairs of Kangan gas power plant
-
Unit 5 GEF5 gas turbine nozzle replacement and combustion chamber observation
-
Unit 5 repair of Kish power plant
-
Unit 6 GEF5 gas turbine nozzle replacement and combustion chamber observation
-
Unit 6 hot line repairs of Kangan gas power plant
-
Unit 6 router replacement and hot line observation of Zahedan gas power plant
-
Unit 7 overhaul of Kangan gas power plant
-
Unit 7 turbine overhaul of Kangan gas power plant
-
Unit1 H.G.P. of MontazerGhaem power plant
-
Units 1, 2 and 4 hot line observation of Shariaati power plant
-
Visit hot gas rout unit NO 4 Mes Sarcheshmeh center
-
Visit hot Gas route and repairs gas turbine No 1(modelGEF6)
-
Visiting hot rout (`4 unit) and repairs bobler (unit`4)
Employing efficient and expert staff
Making use of modern and advanced tools
Improving the technical knowledge
Steam Turbine
Steam Turbine Steam turbines are used either for production of electricity or as a stimulant of different pumps in electricity, oil, gas, petrochemistry and other industries. In case repairing of these kinds of turbines is not performed by experts, …
Gas Turbine Generators
Gas Turbine Generators Gas turbines are used in power plant, oil, gas and petrochemistry industries thanks to their rapid installation, lower investment expenses, fewer secondary equipment, and rapid installation and utilization. A great number …
Maintenance and repairs
Fundamental repairs, hot line observation and gas turbine combustion …
Installation
Installing and launching gas turbine units, steam turbine and …
Providing equipment
Providing necessary power plant tools and equipment from national …
Engineering activities
Performance of non-destructive tests Measurement of axes vibrations …
Projects
Policy
In order to reach the above mentioned goals, NGP has opted the following items as its policy:
- Employing efficient and expert staff.
- Using the latest technical knowledge and international standards in the area of its activities and transferring the knowledge and standards into the country.
- Making use of modern and advanced tools.
- Training young and talented staff.
- Improving the technical knowledge of their customers and colleagues in the area of their activities through holding training sessions conducted by native and foreign specialists.
Niroo Gostaran Parmida Co.
Niroo Gostaran Parmida company (pvt.) was established in 1387 by a group of skilled and experienced power plant engineers and specialists as a commercial and technical company in order to work in the area of energy especially installation, utilization and repair of power plant units, construction of DG generators and production of gas and steam turbines.